Proiecte

Petromidia FCC

CLIENT:

Rompetrol Rafinare

VALOARE:

$7 million

Petromidia FCC

Goals:

A new configuration of the 138FV3 regenerator, based on the study of the UOP licensor, for the operation of a catalytic cracking unit at a capacity of 185 m3/ h.

General description:

  • Detailed Design based on the UOP study
  • 5 sets of cyclones (1st and 2nd stages)
  • plenum chamber in the new configuration of cyclones
  • air distributor
  • regenerator top cover
  • replacement of the refractory protection of the regenerator

The project’s outcome is the improved flows, reduced emissions, savings of raw materials and energy consumption, as well as increased mechanical availability of the Catalytic Cracking Unit and decreased risk of unscheduled/emergency shutdowns of the unit.

The project was completed on April 23, 2020.

Galerie

Petromidia FCC
Petromidia FCC
Petromidia FCC

Descoperă și alte proiecte

Modernizarea rafinăriei Petromidia


Află mai multe
Modernizarea rafinăriei Petromidia

Modernizarea rafinăriei Pavlodar


Află mai multe
Modernizarea rafinăriei Pavlodar

Proiecte Downstream


Află mai multe
Proiecte Downstream

Petromidia FCC


Află mai multe
Petromidia FCC

Petromidia Turnaround 2020


Află mai multe
Petromidia Turnaround 2020

New SRU


Află mai multe
New SRU

Isaccea


Află mai multe
Isaccea